Building/Stewardship

SPC panorama sep end of summer 2012

  We are very pleased to note

That total renovation of our
WASHROOMS downstairs is well underway.

We have made substantial progress towards collected funds intended to be used the repaving of our entire DRIVEWAY.


THE REMOVAL OF DAMAGED PLASTER
IN THE SANCTUARY HAS BEEN DONE 

With funds in place, bids are being considered for the remaining
work of re-plastering and repainting the three affected areas.

REMOVAL AND REPLACEMENT OF
THE ALTAR PLATFORM
was completed in May, 2016.  The damaged softwood flooring was replaced with a beautifully stained hardwood which will last for many years.  Thanks to the generosity and hard work of
Peter, Josh and Brenda Scott


 REPAIRS TO THE FELLOWSHIP ROOM
AND KITCHEN SUBFLOORS
were completed  at the end of August, 2015
through generous donations and volunteer labour


REMEDIAL EXTERIOR WORK TO THE WINDOWS,
SILLS AND ADJACENT BLOCK WORK
of the building was completed by September, 2014  by
“First Class Contracting” .  This work included rebuilding the sills and covering them with metal as well as 
carefully matching up the custom  colour of the block work for repairs as well as servicing windows and frames.  A beautiful job was done!


STILL TO BE UNDERTAKEN

 When sufficient funds have been raised
REPOINTING OF EXTERIOR BLOCK WORK
on the building including the pink caps
which crown the “hips” of the building.


Estimates have been received for the installation of
NEW PEW CUSHIONS
With some funds already raised for this purpose
the worship committee is considering the best options.


A Congregation of The Presbyterian Church in Canada